
FP7 — Grant agreement 285153
Reduction of suicides and trespasses on railway property

The project
RESTRAIL is a Seventh Framework Programme project led by UIC. It gives the rail industry an analysis of cost-effective measures to prevent suicides and trespass on railway property, and to limit the disruption those events cause.
Two reductions
- The occurrence of suicides and trespass on railway property
- The service disruption and the other consequences these events cause
Main objectives
The project answers a rail-industry question with experts from health, law enforcement, emergency services, education, social services and the media, so the result can be used by everyone who meets these events.
What the project set out to do
- 01
Analyse the causes of suicides and trespass on railway property from existing data, studies and research.
- 02
Identify the prevention and mitigation measures already available, and the conditions under which they succeed in a rail environment.
- 03
Field-test selected measures and evaluate how effective they are.
- 04
Propose a toolkit of the most relevant and cost-effective measures, with recommendations at European level.
What it leaves behind
- 01
A toolbox for choosing, implementing and documenting measures.
- 02
Recommendations decision-makers can apply across Europe.
- 03
Field tests that show which measures are feasible and cost-effective.
From evidence to a toolbox
Seven work packages, October 2011 to September 2014. The full text of each package is on the work packages page.
- WP1
Qualitative analysis (VTT)
Collect and analyse data on railway suicides and trespassing accidents, their causes and their consequences.
- WP2
Suicide prevention measures (Trafikverket)
Identify and assess the most efficient measures to prevent suicides, and the conditions under which they succeed.
- WP3
Trespass prevention measures (IFSTTAR)
Assess technical and soft measures that prevent trespassing, and draft guidelines to reduce fatalities and disruption.
- WP4
Mitigation of consequences (MTRS3)
Develop methods and tools that limit the impact of an incident on railway operations.
- WP5
Field pilot tests (CIDAUT)
Select the most promising measures, test them in the field and evaluate whether they are feasible and cost-effective.
- WP6
Dissemination (UIC)
Share the results with the rail community and keep the toolbox usable after the project.
- WP7
Project management (UIC)
Keep the consortium on budget and on schedule, and report to the European Commission.
September 2014
Practical guide
The practical guide collects the measures, the field-test results and the recommendations in one document for infrastructure managers, railway undertakings and station managers.

RESTRAIL Toolbox
A problem-solving guide for selecting measures, implementing them, and recording what works. It is the main result of the project, and it is still online.